In the last two posts, I wrote about pricing labor and marking up materials. But getting the number right is only half of an estimate. You still have to put it in front of the customer in a way they can follow. For years, that part of the job took me far longer than it should have.
What one estimate used to take
I’d jot notes on my phone at the site visit, go home, and put it all in a spreadsheet, thinking long and hard about what to charge for each task. Then I’d move it to a Word document, format it by hand, rewrite the scope shorter so it would fit in a table, and second-guess how it would look when the customer opened it. On a complicated job, that could take multiple hours.
I typed every job twice, and it showed
I pulled up one of my old estimates for this post. It’s three pages. The first two list the work room by room. The third is a table with the same work, room by room, in 16 lines.
The written scope says: “Install barn door system to cover basement door opening, including mounting track trim and stops.” The table says: “Barn door install for basement opening.” The details about what’s included didn’t make the trip.
It gets worse. The table charges for 40 feet of baseboard in the office. The written scope for the office only mentions adjusting the door. The same thing happened with 4 feet in the kitchen. The total added up fine, but the two halves of my own estimate didn’t match.
That’s what happens when you write the same job twice.
The job where the table fell apart
One customer wanted seven windows trimmed, all different sizes, in different rooms. There were also pocket doors to adjust, baseboard to replace, and closet doors that needed custom work. With that much variety, the table confused her, and to some extent it confused me.
At the end of the first week, I asked for payment for the work I’d finished. That’s when she added more work. Instead of writing a change order, I rewrote the whole estimate. It made a mess of the finances, and it took me a long time to sort out. Part of that was me standing in her kitchen, trying to pan around a spreadsheet on my phone to make sense of it.
The lesson: once the customer has the estimate, leave it alone. New work goes on a change order.
What should go on a contractor estimate
Your information: business name, logo, phone, and website.
The customer’s name and address, plus the name of the job.
A date and an estimate number, so you both know which one you’re talking about.
One table of the work: quantity, task, unit, unit price, and line total.
Rooms, if the job has more than one.
A scope for each task, in plain words.
Whether materials are included. If it’s labor only, say that near the top.
What’s not included.
The total.
Write the scope so nobody has to guess
The table says what you’re charging for. The scope says what they get for it. Here’s the scope for a barn door job from a recent estimate of mine:
Price covers installation of doors and hardware furnished by others and already on site: assembling and leveling multi-piece tracks, hanging four slabs, setting floor guides, and adjusting reveals for proper operation. Wall framing conditions behind finished drywall are unknown and were not installed or verified by us. This bid assumes continuous solid wood blocking exists at track height. If adequate backing is absent, additional structural support is required and is a change order.
Compare that to “Barn door install.” The longer version says who’s supplying the hardware, what I can’t see behind the drywall, what I’m assuming, and what happens if that assumption is wrong. If there’s no blocking at track height, we’ve already agreed on what happens next.
It doesn’t have to be long every time. A standard job can be a few short lines: “Install prehung interior door unit up to 6'8" tall x 36” wide. Basic hardware installation included. No demo included.” The size limit and the demo line are doing real work there.
Say what’s not included
The line I put on almost everything is “No paint or paint prep included.”
People assume a trim carpenter fills nail holes and caulks the trim. I’m not a painter, and I leave those tasks to whoever is doing the painting, because they likely use different products and techniques than I would. If that isn’t in writing, the customer finds out when they look at unfilled nail holes.
Think about what your customers always assume you’ll do, and put it on the estimate.
What I still need to fix
I’m not going to pretend mine are perfect. I don’t put payment terms, deposit requirements, or how long the price is good for on my estimates yet. I tell customers my work is warrantied for one year after completion, but I say it out loud instead of writing it down.
Do as I say here, not as I’ve done. Put all of that in writing. And some states have rules about what a contractor’s agreement has to include, so check yours.
You can do this without an app
Make one template and stop rebuilding the formatting.
Write the work once. Use one table with the scope under it, not two separate descriptions of the same job.
Save your scope wording for the tasks you do most.
Keep your standard exclusions ready to paste in.
Write change orders. Don’t rewrite an estimate the customer already has.
Email it to yourself and open it on your phone before you send it.
Where BuiltWright comes in
I built BuiltWright to get rid of the double work. Each task in my pricing catalog has its own price and its own scope wording, so I only write it once. When I add a task to a job, both come with it, and anything specific to that job goes in a notes field that prints with the scope.
If the same task shows up in several rooms, the scope is written one time, with each room listed under it and its own details: door size and swing, linear feet, or a note like “Base stops at the closet opening.” The table and the scope come from the same lines, so the baseboard footage in one always matches the other. That’s the mistake I made by hand.
For work I already have in the catalog, I can get an estimate out while I’m still standing in the customer’s house. I’ve done it.
When an estimate goes out, the app keeps a permanent copy of what the customer received, and new work goes on its own change order. Customers get the estimate by email and can also open it on a phone-friendly page in their browser.
You can see it in the free demo, with no account needed. It comes with sample customers at different stages of a job, including a seven-room doors and trim package, and you can build your own estimate and preview the finished document.
Next up: why the app had to work with no signal, and what happened when I tried to open a spreadsheet at a customer’s house.